Court issues injunction against Saskatchewan windfarm

3 septembre 2010

Ce billet est disponible en anglais seulement.

The Saskatchewan Leader-Post is reporting that a Saskatchewan court has issued an interim injunction temporarily stopping construction of a windfarm near Moosomin.

The $60 million, 25 MW Red Lily windfarm, owned by Algonquin Power and Gaia Energy, was to have come into service late in 2010 or early in 2011.

The project was to have been constructed with minimum setbacks of 550 metres from residences.  Landowners are seeking to have turbines at least 2000 metres from residences.

The interim injunction stops "all construction-related activity".  Further arguments on the injunction application will be heard on September 7. 

MISE EN GARDE : Cette publication a pour but de donner des renseignements généraux sur des questions et des nouveautés d’ordre juridique à la date indiquée. Les renseignements en cause ne sont pas des avis juridiques et ne doivent pas être traités ni invoqués comme tels. Veuillez lire notre mise en garde dans son intégralité au www.stikeman.com/avis-juridique.